President • 17 August, 2020

The President receives Minister of Industry and Infrastructure Development

2 time viewed

Kassym-Jomart Tokayev listened to Beibut Atamkulov’s report on the results of his Ministry’s activities for 7 months of 2020, as well as information on the implementation of state programs, Akorda says.

According to Beibut Atamkulov, in general, despite the crisis situation related with the pandemic, positive results have been achieved in all supervised industries. According to the Minister, to date, 7 million square meters of housing have been built under the “Nurly Jer” program, and the housing conditions of 61.3 thousand families have been improved.

As far as the “Nurly Zhol” program is concerned, the work is underway on the construction and reconstruction of 9.8 thousand kilometers of roads of national and local significance.

Within the implementation of the Industrialization Map, it is planned to introduce 160 projects in all regions of the country by the end of the year.

At the end, President Tokayev gave a number of instructions aimed at further stimulating the manufacturing industry and increasing the share of processed products to saturate the domestic market. Kassym-Jomart Tokayev called it an important social task to ensure timely commissioning of planned housing volumes for the current year. The need to continue modernizing the transport and transit infrastructure was also noted.

Last news

2.6 million students to study in distance

Education • 06 August, 2020

375 people died from coronavirus infection

Coronavirus • 13 July, 2020

Turkey sends humanitarian aid to Kazakhstan

Coronavirus • 13 July, 2020

Kazakhstan mourns Covid-19 victims today

Kazakhstan • 13 July, 2020

How the main city of Kazakhstan developed

Kazakhstan • 08 July, 2020

Russian doctors arrive in Kazakhstan

Coronavirus • 07 July, 2020

Nursultan Nazarbayev marks his 80th birthday

Елбасы • 07 July, 2020

Similar news